To obtain a new permit:
|
To renew your current permit:
|
Step1
|
A responsible company representative must attend the City's Liquid Waste Generator (LWG) Waste Reduction and Pollution Prevention workshop
|
Submit both an up to date Pollution Prevention (P2) Policy Statement, and Pollution Prevention (P2) Plan. The submittal of these documents should be received at least thirty days before your permit expiration date. Fully editable models of both documents are available on the right-hand side of this page under "Resources".
|
Step 2
|
Complete and submit a City LWG Questionnaire. The questionnaire can be found on the right-hand side of this page under "documents".
|
Our program must review and accept both the P2 Policy Statement and the P2 Plan
|
Step 3
|
Develop a Pollution Prevention (P2) Policy Statement. A fully editable Model P2 Policy Statement can be found on the right-hand side of this page under "Documents".
|
Past annual inspections must indicate overall compliance with our Liquid Waste Control Program rules and your P2 Plan.
|
Step 4
|
Develop and Implement a Pollution Prevention (P2) Plan. A fully editable Model P2 Plan can be found on the right-hand side of this page under "Documents".
|
Your company must notify the City's Environmental Analyst and your waste hauler of your next scheduled liquid waste hauling so our program can perform a control monitoring (testing) event on this hauled liquid waste.
|
Step 5
|
Demonstrate through Baseline-Monitoring that liquid waste generated from their facility is non-hazardous, compatible, and in compliance with pollutant guidance levels established in Section 77:01:01:A02 of these rules.
|
Control monitoring results must indicate that your liquid waste is in compliance with guidance levels established in Section 77:01:01:A02 of the City's Liquid Waste Control Program Rules.
|